온라인 홀덤사이트Paris Sportifs BelgiqueMeilleur Site De Casino En Ligne BelgiqueParis Sportif Sur Le Tennis신원인증 없는 카지노
North Central Vocational School (Miami-Dade, FL)

This new school project built for the Miami-Dade Public Schools Board consisted of approximately 300,000 square feet of building area in 12 attached buildings, including slabs-on-grade, concrete and steel structural framing, concrete masonry and glass block walls, elevated slabs-on-prestressed concrete joists, built-up roofing, preformed metal roofing, light gauge metal stud framing, mechanical and electrical systems, chiller plant, intrusion alarm system, fire protection system, cooling towers, utilities, door and window units, gymnasium, cafeteria, and kitchen. 



Owner: Dade Count Public Schools
Amount: $11,465,900
Delivery Method: Bid Build
Completion Date: 1-Jul-92

Browse these next